|
|
| 25TH
AVENUE GRAVEL PIT, WATER
STORAGE RESERVOIR AND INLET/OUTLET STRUCTURES
Greeley,
CO |
|
Project
Highlights:
- Design and construction of an 8,460-ft-long slurry wall
around 70-acre gravel pit.
- Performed geotechnical investigation, final design, and
specifications.
- Performed initial liner test.
- Provided construction monitoring and quality control.
|

Project
Details
|
|
PERRY
PIT SLURRY WALL
Wattenburg,
CO |
Project
Highlights:
- Slurry wall, 6,000-lf-long, 30-ft-deep.
- Performed mix design verification, construction observation,
and quality control testing.
- Reviewed all bid documents.
|
|
|
|
|