| Soft Ground Tunneling Projects |
|
SR-66
(DIAMOND AVENUE) STORM SEWER TUNNEL
Evansville,
IN |
|
Project
Highlights:
- 1 mile long, 96 in. inside diameter gravity storm sewer.
- Provided design reviews and oversight.
- Provided complete design services and claims assistance.
- Project deliverables included Geotechnical Baseline Report,
Geotechnical Interpretive Report, and plans and specifications.
|

Project
Details
|
|
TRILBY
ROAD/FOSSIL CREEK FLOOD CONTROL PROJECT
Fort
Collins, CO
|
| Project
Highlights:
- Two 10-ft-diameter tunnels.
- Provided geotechnical and tunnel design.
- Project deliverables included geotechnical and tunnel
design reports, technical specifications, and tunnel detail
drawings.
|

Project
Details
|
|
WEINBACH
AVENUE STORM SEWER
Evansville,
IN |
|
Project
Highlights:
- 8,800-ft-long, 96-in. inside diameter concrete pipe gravity
storm sewer.
- Provided complete tunnel design and construction services.
- Earth Pressure Balance tunnel boring machine was used
to excavate the tunnel.
|

Project Details
|
|
|
|