Lyman Henn, Inc. - Engineering Solutions from the Ground Down  
 

Water/Wastewater Projects
 

LONGMONT DESIGN-BUILD WATER TREATMENT PLANT

Boulder County, CO

Project Highlights:

  • New water treatment plant for a 55-acre site and consisted of a 30 MGD water treatment facility.
  • Provided geotechnical engineering services.
  • Performed seepage, settlement, and slope stability analysis.

 

 

 

 

 

 

Project Details


CITY OF NORTHGLENN WASTEWATER TREATMENT PLANT AND BULL RESERVOIR DAM MODIFICATIONS

Northglenn, CO

Project Highlights:

  • Perfomed geotechnical evaluation and provided recommendations.
  • Planned and implemented geotechnical siting study.
  • Design and construction of a new wastewater treatment plant.

 

Project Details


EAST CHERRY CREEK VALLEY WATER AND SANITATION DISTRICT, WILLOWS PIPELINE AND WESTERN WELLFIELD CONNECTION PROJECTS

Douglas and Arapahoe Counties, CO

Project Highlights:

  • 13 miles of transmission pipeline includes trenchless crossing at I-25.
  • 8.5 combined miles of wellfield connection pipeline.
  • Coordinated and conducted subsurface investigations which included 39 borings; five groundwater observation wells; and 64 borings along Western Wellfield.
  • Provided recommendations for pipeline and vault design.

 

 

Project Details


 

Site Map | Privacy | Contact Us | Employment | About Our Site

Copyright © 1998-2006, Lyman Henn, Inc., an Equal Opportunity Employer
All trademarks and registered trademarks appearing on LymanHenn.com are the property of their respective owners.

For problems or assistance with this site, email: admin@lymanhenn.com | Stats | Admin

By Matt Vegas at www.mattvegas.com