Lyman Henn, Inc. - Engineering Solutions from the Ground Down  
 

Project Summary

WEINBACH AVENUE STORM SEWER

Evansville, Indiana

Lyman Henn provided complete tunnel design and construction services for this approximately 8,800-ft-long, 96-in. inside diameter reinforced concrete pipe gravity storm sewer. Field investigation programs were conducted to characterize subsurface conditions, which were found to consist of cohesive glacial and alluvial clays or non-cohesive, fine-grained sands. The tunnel was excavated using an Earth Pressure Balance tunnel boring machine (EPBM), and the annular space between the pipe and the tunnel initial support was backfilled with cellular concrete. Project deliverables included a Design Criteria Report, Geotechnical Data Report, Geotechnical Design Summary Report, plans, and specifications. Construction-related services included review of contractor submittals and a full-time construction manager and chief tunnel inspector.

 

[PRINTABLE VERSION]

 
 

 

Site Map | Privacy | Contact Us | Employment | About Our Site

Copyright © 1998-2006, Lyman Henn, Inc., an Equal Opportunity Employer
All trademarks and registered trademarks appearing on LymanHenn.com are the property of their respective owners.

For problems or assistance with this site, email: admin@lymanhenn.com | Stats | Admin

By Matt Vegas at www.mattvegas.com